Benelli 900Sei  Construction Diary

Enlargements of construction pictures.

CONSTRUCTION INFORMATION - story page number nine
The front disc brake and fork leg were in a poor state. The disc's were sent for shot-blasting and the leg to the metal treatment specialists Baker Engineering for polishing. The forks were stripped ready for a full refurbish. There was a minute peace of rust on the fork leg which AP Philpot speedily eradicated. The discs' would eventually be crossed drilled.
  Return to Benelli Home Page  

HOME <> SITE MAP <> CONTACT US <> ABOUT US <> PUBLIC PRESENTATIONS <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATIONHOME <>  SITE MAP