JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

December~05

Martie of Ament  looks back at the stern where the Klipper design can start to be appreciated, in particular, the way the steelwork will hydrodynamically guide the water to the props for maximum thrust.

return to diary build page
 

 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION