|
CONSTRUCTION DATE and information |
PICTURE |
||
January~06 Behind the curved bow post and first bulkhead is (or will be) the bow storage area. An early design mistake here will be rectified because it is too small. It will be lengthened by one frame section to properly accommodate its eventual bike and RIB transport. |
|||
return to diary build page | |||
|
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |