JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

March~07

JENAL gets loving attention as she is smoothed and preened ready for her 'serious' paint system. The double sided welds are ground down on the outside and filled to shapely perfection.

Ament are great at detailed finishing and this can be easily identified here when you look at the rolled steel bar below the oval anchor tube hole. It is there to prevent the anchor and its chain from scraping the hull as it is raised and lowered.

return to diary build page 2
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION