PICTURE

May (late)~07

A view from the lounge, aft at the place where the lowered floor of the kitchen will go (yet to be cut as a round).  The floor of the wheelhouse intrudes a little here and will need some re-engineering to assist with extra kitchen space.

The upper wall boards (window section) will be cut up to the level of the the gunnel underside.