|
CONSTRUCTION DATE and information |
PICTURE |
||
May (late)~07
A view from the lounge, aft at the place where the lowered floor of the kitchen will go (yet to be cut as a round). The floor of the wheelhouse intrudes a little here and will need some re-engineering to assist with extra kitchen space. The upper wall boards (window section) will be cut up to the level of the the gunnel underside. |
|||
return to diary build page 3 | |||
|
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |