JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

June (early)~07

The main cabin windows, all installed in their correct place.  They sit perfectly in their recessed superstructure apertures.

On the roof to the top left of the picture you will see an example of Alan having a 'Blue-Peter' moment.  He made a cardboard model of the navigation light stands which will attach to the port and starboard wheelhouse roof area and hinge upward to allow the front corner windows to open back, flat against the wheelhouse sides for both ventilation and aid wheelhouse lowering.

The stainless steel louvered vent is the outlet for the cooker extractor hood.

return to diary build page 3
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION