|
CONSTRUCTION DATE and information |
PICTURE |
||
July~07
Eddy and Manu of INPALA Interieurbouw complete their initial panelling out of JENAL, here the walkway beneath the wheelhouse is almost finished. The snug fitting stairs to the aft bedroom, ahead, are removable to gain storage access. The ceiling is panelled in white T&G, as will the remainder of the ship. The grey water-tight engine and electrics room doors will eventually be painted to colour match (as best one can) the hallway décor. The small brass porthole in the steel room doors enables component surveillance without opening these heavy doors. |
|||
return to diary build page 3 | |||
|
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |