JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

July~07  (UK Supplement)
Esse Fire This is a portside cabinet, it carries on as part of the full run of cabinet and draw units on this side of the lounge. It is self standing and will have a gap to its left side where the Esse electric fire (left) will sit.

The rosewood plinth covering will be fitted after the cabinetry is installed into JENAL.
return to diary build page 3
 

HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION