|
CONSTRUCTION DATE and information |
PICTURE |
||
October ~07
Stainless steel abounds. There are two drop-down steps on the front face of the aft superstructure to aid access onto the sun-deck area, the 24v two-tone signalling horns are attached to the side of the transverse storage box and match the newly uncovered (masked-up for months during the paint application) stainless hand rails that run around the forward superstructure roof area. Even the kitchen extractor outlet has a louvered stainless cover. |
|||
return to diary build page 3 | |||
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |