May ~ 13

Because JENAL is stored at the Ament boatyard in their open hard-standing area, the appalling 2013 winter/spring conditions had placed a halt on external work but thankfully Frits Schrauwen (marine electrician) was able to work internally.

Frits was originally commissioned to develop the DC (operational) circuits but the 5 year delays meant a change in J&A's plans. Giving Frits the AC (domestic) side to sort out as well, with the added problem of all the wood and Thinsulate walls being constructed, making it simpler to use Mastervolt switching electronics than a multitude of lighting cable runs throughout walls.

   