JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

June ~ 13

The master bedroom in the bow of JENAL starts to take shape with the 2 bedside cabinets flanking the space where the 5' wide double-bed will sit, once the carpenter has made it. The open ended box will be a cupboard under the foot end of the bed. The bed will be on hydraulic rams to ease its hinged lift to access the underside storage and black-water-tank below this floor area.

 
return to diary build page 4
 

HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION