JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

August~13

JENAL has a Webasto air heating and air conditioning system throughout her living accommodation which required the installation of large air handling units. DBA member and friend, Chris Grant came to our rescue and prevented Ament installing these units snuggly under the floor. Pulling air from a cold bilge area in winter would have been an absolute no, no!

Chris has installed these two 3kw air handlers under part of the master bed, ducting air from the base of the shoe cabinet at the foot of the bed, through a false floor and wall-back into an eventually sealed wooden chamber where the black air handlers can be seen. Blowing out each side of the bed base. A much better idea, albeit loosing some under-bed storage area which is accessed via hinged gas-sprung rams, to assist the mattress lifting.

There are trap doors in the floor, each side of the plinthed bed where additional storage space can be best utilised.

 
return to diary build page 4
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION