JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

September~13

This is the completed en-suit (shower & loo) wet-room for the master bedroom showing a high mounted heated chrome towel rail, loo, wall mounted controls for main and hand shower attachment. The porthole is filmed with an opaque covering to prevent prying.

Eddij has not installed the twin paneled leaded-light door yet because worker access is easier without them

 
return to diary build page 4
 

 