JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

October~13

At long last the hydraulically controlled mast was fully operative. It coped easily with the dockside collection and lowering of the 2 bicycles into the forepeak. And will soon be called into action to lower 'A's Benelli into the forepeak, as the ever decreasing space there, diminishes further as Alan stores more 'stuff' in there.

 
return to diary build page 4
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION