JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

December~06

The starboard-side front window is shown partly open as it swings on its hinge. This one and its portside partner hinge back 180 degrees against the side window position for wheelhouse lowering. The front screen, like the rear one hinges down into the horizontal position for wheelhouse lowering.

Martie and Richard are below decks sorting out the cable and hydraulic ram system which allows the wheelhouse to lower in just a few minutes.

return to diary build page 2
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION