JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

July (beginning)~06

The bow storage locker has always been a compromise design. Not too large to steal internal living space but just large enough to house the Silver Marine RIB and the BMW R1200 GS bike (plus other odds-n-sods).

Here, we can see the result of its incarnation. Forward is the regulation watertight bulkhead, attached to this will be the anchor chain locker. This picture shows the winch mounting and a single anchor aperture. Pending new regulations indicated a ship of JENAL's size would need 2 bow anchors so Martie would have to re-fabricate this area to accommodate both.

 The forepeak locker door is a large and weighty item so it is left off to aid the fabricators. It will eventually be opened by hydraulic rams.

   
return to diary build page
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION