JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

July (beginning)~06

The master bedroom in the bow area of JENAL. At present, not particularly inviting to sleep in? The 1,000 litre steel black-water tank you see here will reside under the king-sized bed! Come painting time, the internals of the tank will be double coated with a special treatment to prevent rusting and aid the pump-out ejecting of waist.  Enough said!!

The two skylight window apertures are spaced so that they will eventually flank the bed rather than directly above it. From a topside perspective, having two skylights allows the mast to lower between them and get closer to the the coach roof.

The oval holes in the hull frames will house the services conduit tubes.

   