|
CONSTRUCTION DATE and information |
PICTURE |
||||||
October~06 The top left picture shows the superstructure coach roof drain tubes, ready and awaiting welded installation. Top right picture is the Dutch reproduction twin bow anchor winch awaiting its bow position destiny. Bottom left shows random steel tubes laying over the forward wheelhouse storage boxes. Bottom right are the remains of the steel plates from which, JENAL's bow and stern lettering were cut. |
|
||||||
return to diary build page 2 | |||||||
|
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |