JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

November~06

The front pin-anchor (spud-leg) is in the foreground, flanked by the 2 rope storage boxes, their hinged tops are yet to be installed. The hole behind the pin-anchor is where the hydraulically activated mast turntable (laying on roof) will go. It attaches to the back of the pin-anchor tube, adding strength and support to the mast location area, transferring and dissipating stress-loads from the mast into the hull as it transforms into a lifting crane.

return to diary build page 2
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION