JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

November~06

A view to the rear of the engine room; the 2 1/2" diameter tube 'silver snake' run on the floor and up the right-hand hull wall is the plumbing for the Cleghorn Waring hydraulically driven bronze bilge pump. It sits at the bottom centre of the snake run and bolts to the steel bracket attached to the inner portside chine. The steel horizontal brackets above it will hold the Webasto diesel powered hot-water heater, Webasto A/C unit and above this lot will sit the Hydrosta hydraulic oil tank.

The 2 x 82mm over-under tubes on the right-hand hull wall are the exhaust outlets for the Volvo-Penta engines. One of the engine bed mounts can be seen in the foreground.

The chalk drawing on the chine wall is a quick design for the proposed water inlet chest needed to serve all the components cooling requirements.

return to diary build page 2
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION