JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

November~06 

The top left picture shows the portside opening floor panel outside the wheelhouse. It is a lockable panel and it houses all the fluid (water, diesel, etc) fillers, it also houses the safety kill cable pulls for the engines and the engine/electrics room air vent shut-offs. See bottom right.

Top right is the underside of the above, where all the filler pipes connect to their respective installed lines.

Bottom left illustrates one of the three stainless steel extractor outlets on JENAL, this one is the bathroom vent where an electric extractor fan will eventually attach.

Bottom right shows one of the internal engine vents, this will eventually have an added 'swan-neck' extension to bring the outlet just below the gunnel. The piece of string attached to one of the engine room vent flaps is an example of Aments attention to detail, the string enabling them to make the correct cable pulley run. Upon completion, the string will be replaced by a purpose-made Bowden cable.

return to diary build page 2
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION