|
CONSTRUCTION DATE and information |
PICTURE |
||
April~07
The engine room continues to fill-up with more and more 'stuff', particularly pipe-work and even more particular, hydraulic pipe-work! The 2 black boxes at the top of the picture are the ECU's (computers) for the 2 engines. Eventually, an aluminium walkway (crawl-way) will sit on top of the light grey box-section in the foreground to straddle all the 'stuff' and allow access to the rear most parts. |
|||
return to diary build page 2 | |||
|
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |