|
CONSTRUCTION DATE and information |
PICTURE |
||
June (early)~07
The bathroom starts to take shape. The hole in the floor is where the step-down 70 x 90cm shower will go. The stepped ceiling is the underside of the wheelhouse settee, the sharp corners will have 45 degree angles cut into them to assure no head-banging! The porthole by the loo will allow the seated a view of the world from a water level perspective. The step in the floor is where the wall between the bathroom and the aft bedroom will eventually site. |
|||
return to diary build page 3 | |||
|
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |