JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

June (early)~07

The bathroom starts to take shape. The hole in the floor is where the step-down 70 x 90cm shower will go.  The stepped ceiling is the underside of the wheelhouse settee, the sharp corners will have 45 degree angles cut into them to assure no head-banging!

The porthole by the loo will allow the seated a view of the world from a water level perspective.

The step in the floor is where the wall between the bathroom and the aft bedroom will eventually site.

return to diary build page 3
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION