JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

June (early)~07

This view is from the hallway and is rearward facing, illustrating the change in floor levels necessitated by the hulls upward sweep to the aft gunnel (companionway).  The green marine MDF wall on the left is the bathroom wall with the vertical grey aft pin-anchor tube to the right. Eddy the carpenter uses his temporary steps to illustrate where the eventual oak curved steps will go. The first floor level above the steps will have the bathroom door on the left and the aft bedroom door on the right.  When finished, it should be cosy and easily usable.

return to diary build page 3
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION