|
CONSTRUCTION DATE and information |
PICTURE |
||
September (early) ~07
The ever-filling engine room has its removable floors fitted. The one directly in front is the entrance step and the one on the right is more of a crawler gangway over the 2 engine transmissions and generator. |
|||
return to diary build page 3 | |||
HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |