January ~ 14 Frits, the marine electrician was busy installing more circuitry, here he has installed forepeak lighting on both sides of the forepeak rear wall, plus 13amp plug sockets to power bike battery charging etc. Try as 'A' might, he finds it difficult to persuade Frits that UK light switches work best when up is off. Rather than the European way of down is off. 'A' sneaks around and changes them when Frits isn't looking. The steel piping and valves in the background are part of the hydraulic installation. |
|
||||