JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

January ~ 14

At last the custom made doors were fitted, after some 5 months delay with wrong hinges, locks and then broken leaded-light window panels. 'J&A' still have not got the leaded-lights yet but at least temporary wood paneling has been installed which has kept the drafts down and gives them some privacy from the working trades.

Nic gave 'A' an installation tip of making the door shuts mechanically tight so that the door lock mechanisms cannot not rattle while Jenal is sailing.

 