JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

July~07

A picture view of the RIB and bike garage with forward pin-anchor tube in the centre. Barely in view at the top right are the hydraulic actuator valves. These are electronically actuated and proportion hydraulic fluid to the various local hydraulic components including the aforementioned pin anchor, bowthruster, 2 rams which open this forepeak store and the mast actuation.

The pump and pipe work in the floor of the forepeak are the black-water pump and plumbing, allowing JENAL to pump overboard or into a waste station.

return to diary build page 3
 

 


HOME <>  SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION