JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

February~07
(UK Supplement)

The master bedroom cabinetry has been temporarily laid out in Andrew Varah' s workshop as production gets underway  in his Warwickshire shop. This picture view would be as one enters the bedroom with the full-height wardrobe on the left (hiding the washbasin, behind it).  Immediately on the right are the 2 cupboard where the washing machine and tumble dryer reside.

The 2 curved tape markings on the floor mark-out where the steps will go, leading to the raised dais where the double bed will sit. One of the bedside cabinets is directly in front centre of the picture with the remaining starboard side cabinets and drawers to the right.

return to diary build page 2
 

 