JENAL Construction Diary

Enlargements of construction pictures.

CONSTRUCTION DATE
and information

PICTURE

Winter ~ 14/15

Ship-builder issues started early on in 2014 with incorrectly installed domestic sump  and pump systems, not man enough for the job intended. These were upgraded by 'A' to more powerful units with built-in macerators. A belt & braces approach for long-term trouble free cruising.

 

In September as cooler weather approached 'A' decided to check the Webasto heater system to see if all was well... it wasn't. A Webasto specialist identified the problem, of water in the heaters exhaust system, preventing it from firing up. The cause was another Ament Metaalbewerking cock-up, they had not made the exhaust outlet with a high enough swan-neck. 'A' had it re-made with a much higher swan neck, as can be seen in the picture - problem resolved.

return to diary build page 5
 

 